Differences in VRC and Elevator

Choosing VRC's vs. Elevators for Expansion:

Description

VRC

Elevator

Advantage

Total Cost of Ownership Much Lower Higher than a VRC

VRC

Installation Time Typically 1-5 days 7-10 days (or more)

VRC

Installation Costs Much Lower Higher  

VRC

State Permits & Licensing Simpler More complex

VRC

Cab Sizes/Capacity Larger Smaller & More Costly

VRC

Operation Intuitive Control with Key Lock and Status Lights Familiar Up and Down Push Button Controls

EQUAL

Equipment Construction Rugged (Industrial Grade) Lighter (designed to move personnel)

VRC

Equipment Room/Penthouse Not required Required

VRC

Telephone & Alarm System Not required Required

VRC

Operator Controls Robust/Industrial Design (lower cost) Complex/Expensive

VRC

Car-top Controls Not required Required

VRC

Over-speed Governor Not required Required

VRC

Power Consumption Lower Higher

VRC

Required Maintenance Lower (routine maintenance only) Higher (costly maintenance contract required)

VRC

Fire-Rated Shaft-way May be required Required (with load bearing walls)

VRC

Shaft-way Lighting, Electrical Outlet, & Sprinkler System Not required Required

VRC

4 ft. Pit/Sump Not required Required

VRC

Annual State Inspection Typically not required Required

VRC




Choosing the right VRC begins with our FREE CONSULTATION
Call us toll free 888.720.0245 or e-mail info@amevertical.com for more information!

©2009 AME Vertical. All rights reserved.

Proud sponsor of the Foundation for Ashley's Dream

Website designed by HyperTEK Corporation